Most Probable Questions for Operation Research of SMU MBA MB0032

I have collected some more sample questions of Operation Research for SMU MBA MB0032 examination. These are the most probable OR Questions for MB0032 that can be asked in MBA examination of SMU. I have already shared some more sample questions in the previous posts of the blog such as – Examination Questions of OR and Some Sample Questions for Operation Research. Operation Research assignment of SMU MBANorth West Corner Rule.

Q: 1 – OR involve research on military operation. (T/F)

Q: 2 – OR is concerned with providing the decision makes with decision aids derived from

a) A total system orientation.
b) Scientific method of investigation.
c) Model of reality.
d) All of the above.

Q: 3 – Operation Research is the systematic application of quantitative methods, techniques and tools to the analysis of problems involving the operations of system by Daellenbach and George (1978) (T/F)

Q: 4 – This new decision –making field has been characterized by the use of scientific knowledge through inter disciplinary team effort for the purpose of determining the best –utilization of limited resources. H.A. Klekamp (T/F)

Q: 5 – OR is the art of giving bad answers to problems to which otherwise worse answers are given T.L.Saaty (T/F)

Q: 6 – Operation Research is a scientific approach to problem solving for executive management (H.M Wagner) (T/F)

Q: 7- Mathematical programming is the broad term for game theory (T/F)

Q: 8 – Network Model applied to the Management (Planning controlling and Scheduling) (T/F)

Q: 9 – Markov-chain Model are used for analysis a system to decide optimal time (T/F)

Q: 10 – Markov-chain Model have been used to test brand loyalty and brand –switching tendencies of consumers. (T/F)

Q: 11 – Decision Analysis Model under risk and uncertainty involving decision making under risk and uncertainty. (T/F)

Q: 12 – A number of computer software are available in the market for solving all types of operation Research models.

a) QSB (Quantitative System for Business)
b) Micro manager
c) STORM and LINDO
d) All of the above

Q: 13 – The optimal value of the given objective function is obtained by the graphical Method or simple method (T/F)

Q: 14 – The solutions of Constraints are decision variables. (T/F)

Q: 15- A feasible solution to an LP problem, which is basic solution, is called the basic feasible solution. (T/F)

Comments (4)

Examination Questions of Operation Research for MBA MB0032

These are the most probable sample questions of Operation Research for SMU MBA MB0032 examination. These are the examination questions of OR for MB0032 that can be asked in MBA examination of SMU. There are already some OR sample questions in the previous posts of the blog such as – Questions of OR and Some Sample Questions for Operation Research.

Q: 1- Any feasible solution the optimizes the objective function is called an______

a) Non-equality solution
b) Optimal feasible solution
c) All of the above

Q: 2- The simplex method of solve the following – L.PP. Maximize Z =7×1+ 5×2
Subject to constraints:

X1 + 2X2 6
4X1 + 3X2 12
X1, X2 ≥ 0

a) Z =21
b) Z = 15
c) Z =16
d) All of these

Q: 3- Apply simplex procedure solve the L.PP maximize Z =3X1+ 4- subject to: 5X1 +4X2 ≤ 200,
3X1 + 5X2 ≤ 150
a) 1800/10
b) 1500/13
c) None of the above

Q: 4- Apply simplex procedure solve the L.PP maximize
Z =2X1+ X2
Subject to 4X1 +3X2 ≤12
4X1+ K2 ≤8

a) Z = 5
b) Z = 4
c) None of t he above

Q: 5- Solve the following transportation problem.

Destination

A B C D

Source I 21 16 25 13 11

II 17 18 14 28 13
III 32 27 18 41 19

Requirement 6 10 12 15 43

a) Rs 796
b) Rs 786
c) Rs 769
d) Rs 799

Q: 6- Four jabs are to be done on four different machines. The cost in (Rs.) producing ith on the jth machine is (1) Rs 48.

M1 M2 M3 M4
J1 15 11 13 15
J2 17 12 12 13
J3 14 15 10 14
J4 10 13 11 17

a) Rs 48
b) Rs 44
c) Rs 49
d) All of the above

Q: 7- Operation Research (or) came in to existence as a discipline during World War II Operation research (T/F)

Q: 8- Or was George B Dantzig 1947, developed linear Method (T/F)

Q: 9- Operation Research Society of America (ORSA) was founded in 1953, (T/F)

Q: 10- 1960`s OR groups were formed in several organization. (T/F)

Comments (6)

Questions of OR for MBA MB0032 SMU Examination

Take the most probable sample questions of OR for SMU MBA MB0032 examination. These mix questions of MB0032 can be asked in MBA examination of SMU. You can take some assignment of MB0032 SMU MBA also such as: Integer Programming Problem and Matrix Minimum Method.

Q: 1- Measures for System Efficiency.

F= T-U (T/F)
T-U+W

Q: 2- ______ may be called experimentation in the management laboratory.

a) Monte Carlo
b) Simulation
c) Both of the above

Q: 3- Student arrives at the head of Manipal University according to a poison input process with a mean rate of 40 per hour. The time required to move a student has an exponential distribution with a mean of 50 per hour. Assume that a single individual moves the students; find the average uniting time of a student.

a) 4.4
b) 4.8
c) 4.6
d) 4.12

Q: 4- New Delhi Railway station has a single ticket counted during the hours. Customers arrive at the rate of 10 portions. The average number of customers that can be served is 12. Per hour.

a) 1/16, 23/6 b) 2/16, 24/6
c) 1/16, 25/6 d) All of the above

Q: 5- At Bharat petrol pump, customers arrive according to a poison process with an average time 5 minutes between arrivals. The service time is exponentially distributed with mean time=2 Min. on the basic of the information, find out.

1) What would be the average queue length?
2) What could be average number of customers in the queuing system?
Operation research

a) 1/12, 1/30, 4/15.
b) 2/3, 3.33,1.33.
c) 1/12, 1/30. d) 2/3, 1.33.

Q: 6- There constraints including non-negativity are satisfied simultaneously in the shaded region is called_______

a) Converx
b) Feasible region
c) Convex point d) Extreme point

Q: 7- *2 + (1-)*1 (where 0 S s1) is called________

a) Convex combination
b) Extreme point
c) All of the above

Q: 8- A point X of a convex set X is said to be an extreme point if there do not exit X1, X2 x (x1x2)

a) Feasible region b) Convex polygon
c) Extreme point d) All of the above

Q: 9- A linear inequality in two variables is known as a _______

a) Half plane
b) Full plane
c) Optimal solutions

Q; 10- A________ is a convex set formed by the inter–section of finite number of closed half–planes.

a) Convex polygon
b) Feasible region
c) None of there

Comments (1)

Some Sample Questions for Operation Research for SMU MBA MB0032 Examination

These are some sample questions of Operation Research of SMU MBA. These are mix questions of MB0032 course for SMU MBA examination. I have already shared some questions about Type A Question for Operation Research and some mix sample questions of Operation Research in my previous posts.

Q: 1- Objective function States mathematically what is being maxi med.

a) Cost or scrap
b) Profit or present value
c) Scrape Variable
d) None of the above

Q: 2- Objective function States mathematically what is being minimized Operation research

a) Cost or scrap
b) Profit or present value
c) Scrape Variable
d) None of the above

Q: 3- ________ represent choices that the decision maker can control.

a) Decision variable
b) Constraints
c) None of these

Q: 4- ________ are limitations that restrict the permissible cho9ise for the decision variable.

a) Feasible Region
b) Decision Variable
c) Constants
d) All the above

Q: 5- __________ represents all permissible combinations of the decision variable.

a) Parameter
b) Feasible Region
c) Constraint
d) All the above

Q: 6- ________is a value that the decision makes con not control and that doesn’t change when the solution is implemented.

a) Para metes
b) Constraint
c) Decision
d) None of the above

Q: 7- The objective function and constraint and addictively these can be no products (eq, x1, x2) or power (eq, x1) of decision variables.

a) Parameter
b) Linearity
c) Formulate
d) None of the above

Q: 8- _______which means that the decision variables must be positive or zero-

A) None –negativity
b) Negativity
c) None of the above

Q: 9- Linear programming application begin with the of model the problem with the general characteristics

a) Optimal
b) Formulate
c) None of the above

Q: 10- linear programming problems are solved with the computer the meaning of the computer output and linear programming concepts can be gained by analyzing a simple two-variable problem with the ———method.

a) Linear programming
b) Graphic method
c) 2-Way method
d) All the above

Comments (3)

Sample Questions of Operation Research MB0032 SMU MBA

These are some sample questions of Operation Research. I have already published Type-A questions of OR (Operation Research) of SMU MBA. These are mix questions of Type-A and Type-B sample. You can subscribe Type-A Project Management Sample Questions for SMU MBA MB0033 also for your examination preparation.

Q: 1- _______is used for project involving activities of repetitive nature

a) PERT
b) CPM
c) All of the above

Q: 2- Estimating the durations of activities taking into considerations the resources required for these execution in most economic manner.

a) Activities
b) Scheduling
c) Event
d) All the above

Q: 3- A point in Represent in that signifies the completion of some activities and the beginning of new ones.

a) Activities
b) Event
c) Project
d) All the above

Q: 4- The network represents project operations or task to be conducted is called

a) Event
b) Activities
c) Operation
d) All the above

Q: 5- Each activity is represented by one and only one in the network –

a) Arrow
b) Line
c) Path
d) None of the above

Q: 6- Each activity is represented by a directed

a) Arc
b) Line segment
c) Activity
d) None of the above

Q: 7- AN activity is said to be __if a delay in the start of the course makes a delay in the completion time of the entire project.

a) Non –critical
b) Critical
c) Delay
d) All the above

Q: 8- An activity is activity such that the time between its earliest start and its latest completion time is longer than its actual duration

a) Critical
b) Non critical
c) Delay
d) All the above

Q: 9- An activity is said to have a slack or float time

a) Non critical
b) Critical
c) Both of them

Q: 10- The critical path identifies all the critical activities of the ________.

a) Project
b) Event
c) Activity
d) None of the above

Q: 11- In a project network, a sequence of activities may from a loop (T/F)

Q: 12- A critical activity must have its total and free floats equal to zero (T/F)

Q: 13- A non -critical activity can not have zero total float (T/F)

Q: 14- The critical path of project network represents the minimum duration needed to complete the network (T/F)

Q: 15- A network may include more than one critical path (T/F)

Q: 16- A concept of experimentation in the management laboratory is called –

a) Monte card
b) Simulation
c) None of the above

Q: 17- Simulation is often referred to as Analysis of –

a) Monte carlo
b) Ulan
c) Von Neumann
d) All of the above

Q: 18- The approach adopted for solving a problem in gambling can be extended to decision making.

a) Simulation
b) Method
c) Bayer
d) None of the above

Q: 19- ________ approach is recognized as a powerful tool for management decision making.

a) Monte carlo
b) Simplex
c) Game theory
d) Simulation

Q: 20- Linear Programming is a _____Process.

a) Optimization
b) Minimize
c) Maximize
d) All the above